Hydrogen Electrolyser

Adsensys is happy to provide you with advice and delivery of products to realize your hydrogen production system. As a certified partner of Enapter, we also supply complete hydrogen production systems from 0.5Nm3/hour up to and including switchable 210Nm3/hour units in, for example, a 40ft sea container. We have experience with the storage of the hydrogen produced and the re-use of the hydrogen produced. If your solution or wish is not listed, please do not hesitate to contact us to discuss your requirements. Due to the modular construction of our systems, we almost always have a suitable solution.

Enapter EL 2.1

The EL 2.1 is the latest development in standardization. The small design and easy integration options make this system extremely suitable for small-scale hydrogen production, but this solution is also suitable for large-scale production. In addition, the system is suitable for on-site production of hydrogen for own use and energy storage.

Enapter EL 2.1
Enapter DRY 2.1

Enapter DRY 2.1

The ENAPTER DRY 2.1 makes it possible to connect 1 or more hydrogen electrolysers to a dryer. This makes it possible to remove water, which is created during the production of hydrogen from energy and water, so that an extremely pure form of hydrogen is created. The maximum capacity of the dryer is five electrolysers.

ENAPTER DRY 2.1
AEM Multicore

AEM Multicore

Enapter’s off-the-shelf AEM Multicore is less expensive than comparable sized PEM electrolysers (and comparable alkaline systems), and brings together the best of water electrolysis technologies. The AEM Multicore is at the top of the field for rapid response to intermittent renewable energy loads, producing high-performance, high-efficiency hydrogen in any context.

AEM MultiCore
AEM Cluster 60

AEM Cluster 60

The AEM Cluster solutions are fully automated and remotely controlled by means of the energy management system. The 30ft. container has everything necessary for the production of hydrogen already installed so that the container only needs to be connected with venting and flushing pipes, water supply, hydrogen drainage pipes and a mains connection.

AEM Cluster 60